一种估计任务努力大小的方法。通常使用的尺寸是:小,中,大和超大型。
例子: The engineering team was prioritizing work for the next half, and went through the t-shirt sizing process to understand the effort required for the highest priority work.
搜索趋势
以下是人们在本网站上搜索过的热门单词、短语和习语的列表。
Tech Titans
Ask
Slammed
Big Time Ball Player
False Economy
新定义
请参阅下面的列表,了解添加到该站点的最新单词和短语。
Wave A Dead Chicken Over It
Overhire
SXSW
Scalable
Stick Handling
日期: 04/19/2025
说: Close It Out
定义: 将某事标记为已完成。
例子: This task has been fixed, so let's close it out within the task tracker.